Wednesday, June 17, 2009

The last big work session

After this day, it's all downhill. June 13, 2009 was cool and sunny, mostly. One group worked from the bottom, smoothing out the chatter marks in the downhill. The other group (myself included) worked on the top connector. This part was pretty cool, as we constructed a short stone path through a mud hole, built a culvert and stone bridge over the Leverich headwaters, and carved out much of the singletrack path. Other fun was had as we got extreme over a couple stumps.

Later in the summer Jason will work in small groups on small upgrades to the downhill.

By fall we may do one last big work day when students have arrived.

No comments: